Two Lane Km 45.325 (Ex Km 48.870) near Basinda Village to Design Km 90.010 (Ex Km 97.903) near Roshni Village section of NH-347B of Betul-Khandwa Package-2 Posted on May 27, 2025May 27, 2025 by rajan gupta Membership Required You must be a member to access this content.View Membership LevelsAlready a member? Log in here
2lane to 4lane divided carriageway with paved shoulder from Km 51.579 Ex Km 77.500 on SH26 near Dewalgaon to Km 108.643 Km 129.900 on NH52 of NH 347B near Julwaniya L57.064kms Posted on May 27, 2025 by rajan gupta Membership Required You must be a member to access this content.View Membership LevelsAlready a member? Log in here
2lane to 4 lane divided carriageway with paved shoulder from Km 0.000 near Deshgaon to Km 51.579 (Ex Km 77.500 on SH26)of NH 347B near Dewalgaon (L51.579kms)under NH(O) Posted on May 27, 2025May 27, 2025 by rajan gupta Membership Required You must be a member to access this content.View Membership LevelsAlready a member? Log in here
2-4 Lane with Paved Shoulders of Hansi-Barwala road section of NH-148B (Existing Km. 170.668 to km. 194.938 (Design length 24.27 km)) Posted on May 27, 2025May 27, 2025 by rajan gupta Membership Required You must be a member to access this content.View Membership LevelsAlready a member? Log in here
6 Lane at Km. 264.237 along with service road in Village Kherika on Hisar – Dabwali section of NH-09 Posted on May 27, 2025 by rajan gupta Membership Required You must be a member to access this content.View Membership LevelsAlready a member? Log in here
2 Lane Service Road from Km. 1072.900 (Umedganj Canal) to Km. 1079.400 (Naya Nohara Under Pass) Section of NH 27 Posted on May 27, 2025 by rajan gupta Membership Required You must be a member to access this content.View Membership LevelsAlready a member? Log in here
service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on Obedullaganj-Itarsi section of NH-46 Posted on May 27, 2025May 27, 2025 by rajan gupta Membership Required You must be a member to access this content.View Membership LevelsAlready a member? Log in here
4 Laning of Marakkanam-Puducherry Section of NH-332A from Km 62.000-Km 108.047 in Tamil Nadu on HAM (Project Length-46.047 km) Posted on May 27, 2025 by rajan gupta Membership Required You must be a member to access this content.View Membership LevelsAlready a member? Log in here
Construction of Service Road, Drain, Junction Development in the stretch of Hajipur-Muzaffarpur Posted on May 27, 2025 by rajan gupta Membership Required You must be a member to access this content.View Membership LevelsAlready a member? Log in here
Six Laning grade separated structure at Sangteda, at Manpura Machedi and Lakher and white topping of service road at 05nos. locations on Gurgaon Kotputli Jaipur section of NH 48 in Posted on May 27, 2025 by rajan gupta Membership Required You must be a member to access this content.View Membership LevelsAlready a member? Log in here