Construction of Two LANE Road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of Bhopalpatnam Venktapura…
Construction of Four Lane with paved shoulder of Bhagalpur Kharhara Village (Dhaka More) from Km 0.000 to KM 36.600 (Total…
Repair and Maintenance of Jalgaon Jamod Nandura Road NH 161H (ch.0.00 to 25.00 in the state of Maharashtra. (At Risk…
Construction of new 4 lane bridge over Umardashi river with approachesat Km. 153.300 Design Km. 153.080 of NH 58 near…
Maintenance of Ribander bypass from Km 143/200 to Km 152/820 on NH-748 in the State of Goa under Performance Based…
Construction of ROB at LC 115B near Nastanpur at Km 126.150 of Nandgaon Chalisgaon section of NH 753J in the…
Construction of LHS and its approaches in lieu of level crossing No.C-23/T-2 at km 221.050 on NH-65 (New NH-152) near…
construction of Foot Over Bridge at Parshuram Ghat, Kamthe and Sawarde and Service Road, Bus Bay with Bus Shelter etc…
Construction of 2-Lane ROB At LC No.AB-27 (Belbahara ROB) on Manendragarh To Ambikapur Section Of NH-43 (Old NH-78) At NH…
Construction of 2-Lane ROB at NH LC No. AB-72 on Surajpur to Ambikapur Road in Km 357.370 of NH-78 (New…
