Construction of Major Bridge across Godavari River at Dusalgaon Village at Km. 75.660 Design km.29.040 and reconstruction of Minor Bridge across Irrigation Canal at Ch. 57.665 Design km 11.045

- By |3:31 pm

Construction of Major Bridge across Godavari River at Dusalgaon Village at Km. 75.660 Design km.29.040 and reconstruction of Minor Bridge across Irrigation Canal at Ch. 57.665 Design km 11.045 along Parbhani Gangakhed Road NH 752K in the state of MH...Read More....

Construction Of NH353 J Stretch from Chandur bazarNaka to Junctionwith NH 548 C (Jasi Rani Chowk) in Paratwada Achalpur city to Four Lane Length 6.19 Km)

- By |3:22 pm

Construction Of NH353 J Stretch from Chandur bazarNaka to Junctionwith NH 548 C (Jasi Rani Chowk) in Paratwada Achalpur city to Four Lane with Paved Shoulder Configuration on EPC Basis in the state of Maharashtra Length 6.19 Km) Opening Date...Read More....

Maintenance of road from Ch.15.00 to 61.500 of NH 334A in total length of 46.500 Km under Performance based Maintenance

- By |3:09 pm

Maintenance of road from Ch.15.00 to 61.500 of NH 334A in total length of 46.500 Km under Performance based Maintenance Contract (PBMC) for the financial year 2024-25 in the State of Uttarakhand Opening Date - 28-May-2025 , Closing Date -...Read More....

753F of Section II Sillod Fardapur Road Design Ch Km 60 630 to Km 99 660 L 32 63 Km to four lane with Earthen Shoulder Descope length km 87 700 to 94 100 c

- By |2:35 pm

Maintenance Rectification Work under risk and cost for Rehabilitation and up gradation of NH 753F of Section II Sillod Fardapur Road Design Ch Km 60 630 to Km 99 660 L 32 63 Km to four lane with Earthen Shoulder...Read More....

Construction of ROB with approaches in lieu of Railway crossing LC 20 on NH 161H at km 24.913

- By |2:20 pm

Construction of ROB with approaches in lieu of Railway crossing LC 20 on NH 161H at km 24.913 in the state of Maharashtra on EPC mode Opening Date - 15-May-2025 , Closing Date - 30-Jun-2025 , Tender Value - 1,49,32,00,000...Read More....

Construction of Two LANE Road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400

- By |11:54 am

Construction of Two LANE Road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of Bhopalpatnam Venktapura Warangal Hyderabad Road of NH163 in the State of Chhattisgarh. Opening Date - 16-May-2025 , Closing Date - 30-Jun-2025 ,...Read More....

Railway RoB at Km. 3.485 along Parali Bypass on Deogaon Fata Pathri_Sonpeth_Parali_Ambajogai_Renapur Fata_Latur_Omerga_road NH 548B

- By |11:46 am

Construction Railway RoB at Km. 3.485 along Parali Bypass on Deogaon Fata Pathri_Sonpeth_Parali_Ambajogai_Renapur Fata_Latur_Omerga_road NH 548B on EPC Mode in the State of Maharashtra. Opening Date - 16-May-2025 , Closing Date - 27-Jun-2025 , Tender Value - 10,53,36,601 , Tender...Read More....

Traffic Management System (ATMS) on National Highway 92, 730B, 730C, and 731K from Etawah to Pilibhit (length 240.726 Km.)

- By |11:36 am

SITC and Operation and Maintenance of Advanced Traffic Management System (ATMS) on National Highway 92, 730B, 730C, and 731K from Etawah to Pilibhit (length 240.726 Km.)in the state of UP (GNHCP) with loan assistance of World Bank on EPC mode...Read More....

CONSTRUCTION OF LIMITED HEIGHT SUBWAY (LHS)/RUB NEAR PROPOSED AT KM 503/0-1 (LC NO-85) ON NH-89

- By |11:22 am

CONSTRUCTION OF LIMITED HEIGHT SUBWAY (LHS)/RUB NEAR PROPOSED AT KM 503/0-1 (LC NO-85) ON NH-89 (AJMER NAGAUR SECTION) IN THE STATE OF RAJASTHAN ON EPC MODE Opening Date - 16-May-2025 , Closing Date - 30-Jun-2025 , Tender Value - 10,55,00,000...Read More....

CONSTRUCTION OF 2L – PS CONFIGURATION KARAULI BYPASS ON NH-23

- By |12:02 pm

CONSTRUCTION OF 2L - PS CONFIGURATION KARAULI BYPASS ON NH-23 UNDER ANNUAL PLAN 2024-25 ON EPC MODE IN THE STATE OF RAJASTHAN , Opening Date - 05-May-2025 , Closing Date - 23-Jun-2025 , Tender Value - 2,72,68,00,000 , Document -NIT...Read More....